Step by step at MBB

The 4-axle Eco1000 in use to move steel bridge elements.

The production process for huge steel bridge elements requires powerful machines to move the heavy and big elements.

At MBB - Metallic Bridges of Belgium, a 4-axle Eco1000 by Cometto with long frame is the reliable partner to solve these mission.

The French railway company SNCF ordered a steel bridge and therefore, this 125 tons piece with a length of 28 metres has to be transported to the anti-corrosion hall for further treatment.

Well done !

Date of publication: 10/2024

Step by step at MBB - Success Stories
Share onWhatsAppLinkedIn